Installation
Our slides ship with mounting hardware consisting of 1/4" mounting bolts, washers, and locking nuts as well as optional z-brackets and 3/16" rivets. If you decide to use the z-brackets, we recommend using a #11 drill bit for predrilling your rivets.
We recommend anchoring your cargo slides with four bolts directly through the mounting tubes which run parallel under the slide deck. Mounting tube position can be customized if necessary- contact us for details. 
Instructions:
After placing and securing the slide in your desired spot, advance the slide deck forward to expose the mounting tubes. Drill directly through the mounting tubes and through the mounting platform (truck bed, trailer base, or van floor) with a 1/4" drill bit.

Add a washer above the mounting bracket and below the mounting surface and tighten with a lock nut. From the top, your completed installation will look like this:

From the bottom, your completed installation will look like this:
Alternative options include mounting the included z-brackets and utilizing l-track mounts or plus nuts installed in the mounting surface.


